Send Message
Shandong Huichi Industry and Trade Co.,Ltd.
Products
quote
Products
products
products
Home > products > Rig Accessories > JZ Series Deadline Anchor And Weight Indicator Used Together For Drilling Rigs
Catagories
Contacts
Contacts: Ms. Cherry
Contact Now
Mail Us

JZ Series Deadline Anchor And Weight Indicator Used Together For Drilling Rigs

Product Details

Place of Origin: China

Brand Name: HuiChi (HC)

Certification: API

Model Number: ZJ Series

Payment & Shipping Terms

Minimum Order Quantity: 1 Set

Price: $1200-6000/Set

Packaging Details: Export Wooden Case And Wooden Palle Or According To Customers' Requirements.

Delivery Time: Within 5-30 Days

Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability: 200 Sets Per Month

Get Best Price
Highlight:

Drilling Rigs Deadline Anchor

,

Deadline Anchor API

,

API deadline anchor drilling rig

Condition:
New
Warranty Of Core Components:
1 Years
Customized:
Logo / Packaging / Graphic
Machinery Test Report:
Provided
Core Components:
Bearing
Material:
Alloy
Usage:
Well Drilling
Weight:
100 KG
Working Temperature:
-25℃~55℃
Condition:
New
Warranty Of Core Components:
1 Years
Customized:
Logo / Packaging / Graphic
Machinery Test Report:
Provided
Core Components:
Bearing
Material:
Alloy
Usage:
Well Drilling
Weight:
100 KG
Working Temperature:
-25℃~55℃
JZ Series Deadline Anchor And Weight Indicator Used Together For Drilling Rigs

________________________________________

Product description:

The Deadline Anchor of oilfield drilling equipment is a key component of the lifting system used to firmly fix one end of the dead rope. Through its own structure, it transmits the dead rope tension to the ground foundation or fixed structure, and cooperates with the live rope to achieve the smooth lifting and lowering of the drilling tool. deadline anchors are widely used on various types of drilling rigs. It is mainly used to fix one end of the dead rope and transmit the tension to the ground foundation or other fixed structures, so that the dead rope maintains a stable tension state in the entire lifting system. In drilling operations, the winch works with the overhead crane, traveling block and other equipment through the wire rope to achieve the lifting and lowering of the drilling tool. As the fixed end of the dead rope, the dead rope holder bears the huge tension in the entire lifting system, ensures the stability and reliability of the wire rope during operation, and avoids accidents caused by loosening or slipping of the wire rope.

________________________________________

Working principle:

The deadline anchor produced and sold by our company Huichi petro is also a mechanism that converts the dead rope tension of the drilling rig into liquid pressure. It is used in conjunction with the weight indicator to measure the hanging weight and drilling pressure of the drilling rig. It is mainly composed of a rope wheel, a base, a sensor and other parts. Among them, the sensor is a key component that can convert the tension of the dead rope into a pressure signal and transmit it to the weight indicator and recorder. The deadline anchor has a variety of technical specifications and parameters, such as the maximum dead rope tension, output pressure, output pressure error, adapted wire rope diameter and instrument working environment temperature, etc. These parameters ensure its applicability and reliability in different drilling operation environments.

________________________________________

Product structure:

The deadline anchor produced and sold by our company Huichi petro is mainly composed of a fixed body made of high-strength steel, connecting parts and protective devices, and some also include rope wheels, bases, sensors and other parts. Among them, the sensor is a key component that can convert the tension of the dead rope into a pressure signal and transmit it to the weight indicator and recorder.

1. Fixed body: It is the core component of the deadline anchor, usually made of high-strength steel, with sufficient strength and rigidity to withstand huge tension. The fixed body is equipped with a special dead rope fixing device, such as a rope clamp, a pressure plate, etc., which is used to firmly fix the dead rope on the fixed body.

2. Connecting parts: used to connect the deadline anchor to the ground foundation or other fixed structures. The connecting parts usually use bolts, anchor bolts and other connectors to ensure that the connection between the dead rope fixer and the fixed structure is firm and reliable.

3. Protective devices: In order to protect the dead rope fixer and the dead rope from the influence of the external environment, some deadline anchor s are also equipped with protective devices, such as protective covers, guardrails, etc., to prevent the dead rope from being damaged by collision, wear and tear, and also ensure the safety of the operator.

________________________________________

Ordering information:

1. Installation method;

2. Drilling rig model;

3. Wire rope size;

4. Wire rope strand number;

5. Maximum dead rope tension.

________________________________________

Features:

1. The design and manufacture of the dead rope fixture complies with API 8C specification and SY/T 5320 and other relevant standards;

2. Made of high-strength steel, it has good tensile strength and fatigue resistance, and the maximum dead rope tension can reach 720Kn;

3. The standard output pressure of the sensor is 6MPa;

4. It can be used with a weight indicator and a recorder, and can be equipped with a JZZ weight indicator and a JZJ recorder, or it can be purchased separately.

5. Number of wire rope strands: 6.8.10.12.14;

6. Wire rope sizes: 22mm, 26mm, 28mm, 32mm, 35mm;

7. According to the installation method, there are two types of deadline anchors: vertical and horizontal.

________________________________________

Application scenarios:

The deadline anchors produced and sold by our company Huichi Petro are widely used in various oil field drilling operations. Whether it is land drilling or offshore drilling platform, as long as it involves drilling lifting system, the role of deadline anchors is indispensable.

________________________________________

Product model parameters:

Type Anchor Type Form of Primary Instrument Max.Deadline load(kN) Number of Lines Load(kN)
JZ900 JZG72 Horizontal 720 14 10080
12 8640
JZ700 JZG60 Vertical 600 14 8400
12 7200
JZ500 JZG42 Vertical 420 12 5040
10 4200
JZ500A JZG41 Horizontal 410 12 4920
10 4100
JZ400 JZG35 Vertical 350 12 4200
10 3500
8 2800
JZ400B JZG34A Horizontal 340 12 4080
10 3400
JZ250 JZG24 Vertical 240 12 2880
10 2400
8 1920
JZ200 JZG20 Horizontal 200 10 2000
8 1600
6 1200
JZ150A JZG18A Vertical 180 10 1800
8 1440
6 1080
JZ150 JZG18 Horizontal 180 10* 1800
8 1440
6 1080
JZ100 JZG15 Horizontal 150 10 1500
8 1200
6 900
JZ60 JZG10 Straight pull 100 8 800
6 600
4 400
JZ40 JZG10A Horizontal 100 6 600
4 400

________________________________________

Product display:

JZ Series Deadline Anchor And Weight Indicator Used Together For Various Types Of Drilling RigsJZ Series Deadline Anchor And Weight Indicator Used Together For Various Types Of Drilling RigsJZ Series Deadline Anchor And Weight Indicator Used Together For Various Types Of Drilling RigsJZ Series Deadline Anchor And Weight Indicator Used Together For Various Types Of Drilling Rigs

________________________________________

Product package:

Product packaging: iron box or iron frame, wooden pallet, wooden box, bulk or customized according to customer requirements.

________________________________________

Product detection:

100% inspection will be carried out before shipment, and video image data and inspection reports will be provided.

________________________________________

Accepted delivery terms:

FOB, CFR, CIF, EXW, FAS, CIP, FCA, CPT, DEQ, DDP, DDU, Express Delivery, DAF, DES.

________________________________________

About HuiChi (HC) petro:

Shandong Huichi Industry & Trade is a professional supplier of drilling equipment for the oil and gas industry. We are committed to providing the best products and services to customers around the world.

We HuiChi (HC) Petro always regard our customers as our partners and aim to achieve long-term cooperation value. Our Huichi products cover different fields such as oil fields, water wells, HDD, etc.

________________________________________

Why choose HuiChi (HC) petro?

One-stop drilling equipment supply;

Employee engineers have more than 10 years of experience in supplying drilling equipment;

More than 10 people engaged in export business;

More than 40 partner countries and regions;

More than 200 customers having close cooperative relationships;

More than 250+ partner factories as suppliers.

________________________________________

Focus on well drilling equipment , we have been working hard and hope to become your most professional oil & gas equipment supplier and the best partner!

Sales Manager: Cherry Chi

Email: cherry@huichipetro.com

Mob/WhatsApp/We chat: +86 15553820372